Elevated Flare

 

 

Zhongtian Hechuang Erdos Coal Processing Demonstration Project Flare system

Height: 150m × 2 sets

Risers: Each set of elevated flare includes a gasification flare with DN1900 riser, a hydrocarbon flare with DN1800 riser and a sour gas flare with DN600 riser.

Construction Location: Inner Mongolia Erdos Tuke

Project Type: EPC

Project Description: Zhongtian Hechuang Erdos Coal Processing Demonstration Project Flare system for the entire plant includes 2 sets of elevated flare, 1# and 2#. Both heights are 150m. Each set of elevated flare includes a gasification flare, a hydrocarbon flare, a sour gas flare, and a cabinet room on site.

Maximum capacity of each flare:

     1#、2# Gasification Flare: 1691190 Nm3/h(1472.3t/h)

     1# Hydrocarbon Flare: 669683 Nm3/h(1137.2t/h)

     2# Hydrocarbon Flare: 733378 Nm3/h(1057.2t/h)

     1#、2#Sour Gas Flare: 48720 Nm3/h(69.5t/h)

     Flare Battery Limit Footprint: 170m×128m

Scope of work: EPC including ground leveling, piling, civil foundation, process, piping, equipment, electrical, instrument, telecommunication, heating & ventilation, architecture, structure, water supply & sewage, fire service etc within flare system battery limit.