WHR system serving for non-ferrous metal smelting

Typical unit capacity: 200,000 ton/year copper smelting and converting for sulfuric acid making

Project Type: EPC

Installation Site: Hengyang, Hunan Province

Project Overview: Using waste gas at 350-370℃ from converter to generate steam at 0.5-1.0MPa supplying for other processes. The waste gas at high temperature goes through heat pipe-evaporator and heat pipe-economizer from the top or bottom of heat pipe type WHR boiler, then will be discharged to the coming process after temperature decreasing.