Welcome to Sunpower Group ! 中文

 

Sintering Waste Heat Recovery

Typical Unit Capacity: 600㎡ Sinter Machine

Project Type: EPC

Installation Site: Rizhao, Shandong Province

Project Overview: Recovering waste heat of high temperature flue gas from air box at sinter machine end to generate MP superheated steam at 2.5MPa by internal heat pipe WHR system or external WHR system. The waste heat can be made full use of.