Welcome to Sunpower Group ! 中文

 

Coking Waste Heat Recovery

Typical Unit Capacity: 1.5m t/y Coking Unit

Project Type: EPC

Installation Site: Dezhou, Shandong Province

Project Overview: During coking process, discharged waste gas temperature is usually around 260~280C, in which waste heat has a great utilization value. Waste gas temperature would be dropped to 150~160C through heat pipe or high efficiency waste heat boiler generating 0.6~1.2MPa superheated steam.